Kitchen Renovation Cost in Brunei: Data from 600+ Projects

Pricing data from over 600 completed residential projects across all four districts of Brunei Darussalam, spanning 2015–2026. This is data from actual completed projects, not estimates.

Last updated: 24 February 2026 · Source: Caramella project records

How we got this data

These prices are taken from actual project receipts. All figures are in Brunei Dollars (BND) and show the final price including materials, making the cabinets, and installing them. We've included countertops where listed. These figures don't include extra work like plumbing, tiling, or tearing out your old kitchen. The prices show the most common range—unusually low-cost or expensive projects are not included.

Kitchen Cabinet Costs by Layout

Layout Typical Range (BND) Median (BND) Includes
Single wall (I-shape) 2,990–7,500 5,800 Upper + lower cabinets, formica doors, DTC hardware
L-shaped 7,000–13,000 9,500 Corner optimisation, soft-close hardware, moisture-resistant carcass
U-shaped 10,000–18,000 13,500 Three-wall coverage, integrated appliance housing
L-shape + Island 14,000–25,000+ 18,000 Island with storage/seating, quartz countertop, full Blum hardware
Galley 8,000–14,000 10,800 Parallel runs, efficient for narrow spaces

Cost by Quality Level

Tier Door Finish Hardware Countertop Typical Add (BND)
Economy Melamine DTC basic Formica Base price
Standard HPL Formica DTC mid / Blum partial Quartz Composite (standard) +15–25%
Premium PET / PETG Finish Full Blum TANDEM + CLIP top Quartz Composite (premium) +40–60%
Luxury Lacquer / High-end PET Full Blum + Higold accessories Quartz / Sintered Stone +80–120%

Wardrobe Costs by Configuration

Type Typical Range (BND) Median (BND)
Standard hinged (8ft wide) 2,800–5,000 3,600
Sliding door (8ft wide) 3,500–6,500 4,800
Walk-in (small, 6–8ft) 5,000–9,000 6,800
Walk-in (large, 10ft+) 8,000–15,000+ 11,000
Full bedroom set (wardrobe + dresser + bedside) 6,000–12,000 8,500

Project Volume by District

District % of Projects Common Housing Types
Brunei-Muara ~72% RPN Lambak, STKRJ Rimba, Mentiri, Kiarong apartments, Gadong detached
Belait ~18% Kuala Belait townhouses, Seria government quarters
Tutong ~8% Tutong town detached, government housing
Temburong ~2% Individual projects

Lead Time Data

Project Type Measurement to Install (weeks) Peak Season Add
Single-room kitchen 4–6 +1–2 weeks
Kitchen + island 5–8 +1–2 weeks
Full house (kitchen + wardrobes + built-ins) 8–12 +2–4 weeks

Peak seasons in Brunei: pre-Raya (typically April–May), year-end (November–December). Lead times extend during these periods due to higher order volume.

Biggest Cost Factors

Based on our project data, the factors that most significantly affect final cost, in order of impact:

  1. Layout complexity — An island adds BND 4,000–8,000 to a kitchen project. U-shape costs 30–50% more than single-wall for the same specification tier.
  2. Countertop material — Quartz adds BND 2,000–5,000 over formica for a standard L-shaped kitchen. This is often the single largest variable.
  3. Hardware tier — Full Blum (TANDEM runners + CLIP top hinges + AVENTOS lift systems) adds BND 1,500–3,000 over economy hardware for a typical kitchen.
  4. Door finish — PET/PETG high-gloss adds BND 1,000–2,500 over Formica. Lacquer typically adds BND 2,000–4,000.
  5. Interior accessories — Higold pull-outs, organisers, and storage systems add BND 500–2,000 depending on count and complexity.

How to Use This Data

About This Data

Related Resources

Want a project-specific estimate? Share your floor plan and preferences.