Production Capacity Warning
Why this matters: The lead-up to Hari Raya is our most heavily booked period of the year. Every reputable carpenter in Brunei reaches maximum capacity months in advance.
- To ensure installation before Raya, on-site measurements must happen ASAP.
- Because we refuse to rush or compromise our 0.1mm CNC tolerances, we strictly cap the number of projects we accept during this period.
- Once our Pre-Raya production slots are filled, no further projects will be accepted until after the festivities.
Our Raya builds focus on creating a space that works when you have guests over. We use high-precision machines to cut your cabinets. Every build includes moisture-resistant boards and silent, soft-close drawers as standard.
Pre-Raya Investment Guide
While we maintain our standard pricing during the festive season, achieving a precise install before the deadline requires immediate commitment. Below are our typical ranges for a premium setup.
| Project | Typical Range | Notes |
|---|---|---|
| Kitchen cabinets (compact) | BND 2,990 – 6,000 (up to 3m) | Simple runs, basic hardware. |
| Kitchen cabinets (full) | BND 6,000 – 18,000 | L-shape, upgraded finishes, premium hardware. |
| Built-in wardrobe | BND 1,200 – 9,000 | 2-door to 4-door, depends on configuration. |
| TV console (built-in) | BND 800 – 3,500 | Wall-mounted or floor, with cable management. |
| Shoe rack / entryway | BND 800 – 2,500 | Built-in with ventilated shelves. |
| Study desk (built-in) | BND 1,000 – 3,000 | With overhead storage and cable routing. |
| Whole House Customization | BND 8,000 – 30,000+ | Synchronized joinery styles across kitchen, wardrobes, and living areas. |
Secure Your Production Slot
Send us photos and dimensions of your kitchen today. We will reply within 24 hours to confirm if we can complete your project before Hari Raya.
The Pre-Raya Timeline
Engineering a precision kitchen takes time. Here is the exact sequence required to guarantee your home is ready for open house season.
Frequently Asked Questions
Soalan Lazim · Frequently Asked Questions
When is the exact deadline to order for Hari Raya?
To guarantee installation before Hari Raya, all designs and measurements must typically be finalised 10-12 weeks prior to the festivity. Contact us immediately to check our current production capacity, as slots fill up fast.
Melayu: Untuk menjamin pemasangan siap sebelum Hari Raya, semua reka bentuk dan ukuran mesti disahkan 10-12 minggu sebelum hari perayaan. Hubungi kami segera untuk menyemak slot pengeluaran semasa kami.
Do you charge extra for rush orders?
No. We maintain our standard pricing year-round. However, because we refuse to rush the CNC cutting process and compromise our 0.1mm tolerances, we simply stop accepting new orders once our Pre-Raya capacity is reached.
Melayu: Tidak. Kami mengekalkan harga standard kami sepanjang tahun. Walau bagaimanapun, kami hanya akan berhenti menerima pesanan baru setelah kapasiti Pre-Raya kami penuh untuk mengekalkan kualiti potongan CNC kami.
Can I renovate just the dry kitchen first?
Yes. Many homeowners choose to focus on the 'Showpiece' dry kitchen and media walls for Raya, and schedule the wet kitchen or bedroom wardrobes for after the festivities. Let us know your priority areas.
Melayu: Ya. Ramai pemilik rumah memilih untuk memfokuskan pada dapur kering dan dinding media untuk Raya. Beritahu kami keutamaan anda.
Do you offer financing for renovation?
Yes. Caramella is an approved vendor for BIBD At-Tamwil financing. You can split your renovation project into 12 to 36 monthly payments, covering kitchens, wardrobes, and all built-in carpentry.
Melayu: Ya. Caramella adalah vendor yang diluluskan untuk pembiayaan BIBD At-Tamwil. Anda boleh membahagikan projek renovasi kepada bayaran bulanan 12 hingga 36 bulan.