What Makes Rimba Different
STKRJ Rimba terrace houses were built across several phases, with the original units featuring enclosed rear kitchen zones that don't suit modern cooking habits. Renovating here requires working within HDD and ABCi structural guidelines while maximizing the usable footprint.
The Dry-Wet Kitchen Conversion
The most effective renovation for Rimba terrace houses is the dry-wet kitchen split. By opening the enclosed kitchen into the dining zone (dry kitchen) and building a dedicated heavy-duty wet kitchen at the rear, you get both a social cooking space and a functional high-heat zone.
What We Use in Rimba Builds
Rimba's inland location and older housing stock create specific material requirements. These are our standard choices for every Rimba project:
Rimba Kitchen & Wardrobe Pricing Guide
Prices below reflect completed projects in STKRJ Rimba. Actual costs depend on kitchen size, finish tier, hardware selection, and whether a rear extension is involved.
| Item | Starting Range | Includes |
|---|---|---|
| Dry Kitchen Cabinetry | From BND 2,999 | ENF carcass, HPL or PETG doors, Blum hinges, soft-close drawers, countertop. |
| Wet Kitchen (Rear Extension) | From BND 3,500 | Marine-grade carcass, sintered stone counter, stainless kickboards, heavy-load runners. |
| Combined Dry + Wet Package | From BND 6,000 | Full kitchen renovation: both zones, coordinated layout, single install team. |
| Built-In Wardrobe (Single Bedroom) | From BND 1,999 | Floor-to-ceiling ENF carcass, HPL or PETG doors, hang + shelf + drawer zones. |
| Master Bedroom Walk-In Wardrobe | From BND 3,500 | Full walk-in layout, LED lighting, drawer bank, mirror panel option. |
Our Process for Rimba Projects
We visit your Rimba unit, assess the existing layout, identify constraints (plumbing, structure, setbacks), and take precise laser measurements.
We produce a fixed BND quote based on actual dimensions. No price escalation after sign-off. You see the layout before committing.
All panels are cut at our Brunei factory to 0.1mm tolerance. Components are assembled and pre-tested before delivery.
Our installation team works after your structural works are complete. Typical kitchen installation: 2–3 days. Wardrobe: 1 day.
Start Your Rimba Transformation
We've worked in STKRJ Rimba. We know the unit types, the constraints, and the materials that last here. Book a site visit and we'll send you a fixed quote within 3 business days.
Also renovating in RPN Lugu or other districts? We cover all of Brunei.