Skip to content
Public Housing Solutions — Lugu

RPN Lugu Phase 2 Kitchen & Wardrobe Designs

Last updated:

We've built for multiple Lugu Phase 2 units. We already have the base dimensions for Type D, E, and F floor plans — which means faster quoting and fewer site surprises for you.

Kitchen layouts from BND 2,999 · Wardrobe layouts from BND 1,999

Floor Plan Layouts

Pre-Mapped Designs for Lugu Type D, E & F Units

RPN Lugu Phase 2 terrace houses share consistent structural shells, but kitchen zone widths and staircase positions vary by unit type. We've mapped these differences so your quote is based on real dimensions, not estimates.

Type F — Galley Kitchen

Narrow 2.4m–2.8m kitchen zones. We use a parallel galley layout to maximize the work triangle while keeping the rear utility exit clear.

Approx. Storage12 linear ft
CarcassENF Marine Plywood
CountertopSintered Stone or Solid Surface
Lead Time10–12 weeks
Request Type F Quote →

Type D & E — L-Shape Hub

Wider kitchen footprint allows an L-shape configuration. Creates a natural prep zone that flows into the dining area without obstructing the corridor.

Approx. Storage18 linear ft
HardwareBlum Soft-Close
CountertopSintered Stone or Quartz
Lead Time10–14 weeks
Request Type D/E Quote →

Wardrobe — Master & Secondary

Lugu bedrooms range from 3.0m × 3.5m to 3.8m × 4.2m. We design floor-to-ceiling built-in wardrobes with hang, fold, and drawer zones matched to your ceiling height.

OptionsSliding or Hinged Doors
InternalHang, Drawers, Shelves
FinishHPL or PETG Matte
Lead Time8–10 weeks
Request Wardrobe Quote →
Climate Engineering

The Lugu Humidity Factor

Lugu sits in an inland zone with below-average wind exposure. Ground moisture retention here is higher than coastal BSB, which creates specific requirements for cabinetry bases.

ENF Marine Plywood Carcass Formaldehyde-free board that doesn't swell or delaminate under sustained 85%+ humidity. Standard on all Lugu builds.
190°C EVA Edge Sealing Every panel edge is sealed at 190°C — the same standard used in commercial refrigerated cabinet manufacturing. Water cannot wick into the board core.
100mm Adjustable Aluminium Legs All base units sit on adjustable aluminium legs with PVC kickboards. This prevents moisture draw from floor tiles during mopping and eliminates termite contact with the carcass.
Blum / DTC Hardware Austrian-engineered hinges and drawer runners rated for 100,000+ open/close cycles. They don't rust or bind in humid conditions the way lower-grade hardware does.
Termite pressure note: Inland Lugu soil has documented subterranean termite activity. Caramella does not use solid timber carcass components in Lugu builds. All structural panels are engineered ENF plywood — wood fibre cross-laminated under pressure — which termites cannot penetrate through normal surface contact.
Cost Expectations

Lugu Kitchen & Wardrobe Pricing Guide

Prices below are based on completed Lugu Phase 2 projects. Actual quotes depend on your unit type, finish selection, and hardware tier.

Item Starting Range Includes
Type F Galley Kitchen (Wet + Dry) From BND 2,999 ENF carcass, HPL doors, Blum hinges, sintered stone countertop option.
Type D/E L-Shape Kitchen (Wet + Dry) From BND 4,500 L-shape run, integrated appliance space, soft-close drawers, full-height uppers.
Built-In Wardrobe (Single Bedroom) From BND 1,999 Floor-to-ceiling carcass, HPL or PETG doors, internal hang + shelf zones.
Master Bedroom Walk-In From BND 3,200 Full walk-in layout, LED strip lighting, drawer bank, mirror panel option.
Explore 12–36 Month BIBD Financing Options →
Why Caramella

We've Done This Before — In Lugu

We've completed cabinetry projects across multiple Lugu Phase 2 units. Here's what that means for your project:

Pre-Measured Templates We have structural reference data for Lugu Phase 2 floor plans. Your quote starts from verified dimensions, not guesses.
Known Constraints We know where the plumbing stacks typically sit, where the utility exit clearance is, and how the staircase soffits behave in each unit type.
Faster Site Visit Our site measure for Lugu units takes 45–60 minutes, not 2+ hours, because we're not starting from scratch on the floor plan.
Local Fabrication Everything is cut and assembled at our Brunei factory. If a panel needs remaking, it happens within days — not weeks of waiting for imports.

Start Your Lugu Project

Tell us your unit type (D, E, or F) and what you're planning. We'll arrange a site visit and send you a fixed quote based on real Lugu dimensions.

Also building in STKRJ Rimba or other districts? We cover all of Brunei.