Schedule Planning

Plan Your Cabinetry Around Raya

Last updated:

If you are planning cabinetry before Hari Raya, share the requested date early so the project scope, production lead time, and installation schedule can be reviewed. Completion by a requested date must be confirmed for the individual project.

Project Timing

Confirm the Project Schedule

Why this matters: A fixed event date needs to be considered alongside the project scope, drawing approval, production lead time, site access, and installation schedule.

  • Share the requested completion date and confirm the site's measurement and access requirements.
  • Production lead time is typically 10–14 weeks from confirmation and customer sign-off of production drawings.
  • Ask for the proposed fabrication and installation dates in writing; the requested date is not guaranteed until confirmed for the project.
Scope to Confirm

Our Raya project scope is confirmed in the quotation and production drawings. ENF plywood is the default carcass specification unless another material is agreed. Caramella currently uses PUR adhesive for machine edge sealing; confirm the exact hardware models and included work in writing.

Kitchen Islands An island may be considered where the room layout and project scope allow. Quartz stone is Caramella's current kitchen countertop offering; confirm dimensions, edge, finish, and included work in the quotation.
Integrated Media Walls Media cabinetry can be planned around the equipment dimensions and cable routes recorded in the project drawings.
The Wet Kitchen Plan wet-kitchen cabinetry around the room layout and equipment. Confirm the selected kitchen kickboard material and base detail in the project specification. Confirm the selected materials and edge details in the project specification, and coordinate plumbing or electrical work with the relevant trades.
Integrated Task Lighting If lighting is included in the project discussion, confirm the product, electrical scope, and installation responsibilities in writing.
Quotation Factors

Raya Cabinetry Quotation Factors

Cabinetry cost depends on the measured dimensions, materials, hardware, installation and included scope. A written quotation confirms these details. A requested Raya date is subject to separate schedule confirmation.

Project Quotation basis Notes
Kitchen cabinets (compact) Cabinet runs, layout and selected fittings Confirm run length and included scope in the quotation.
Kitchen cabinets (full) Cabinet runs, layout and selected fittings Confirm layout, finishes, hardware, and included scope in the quotation.
Built-in wardrobe Door finish, internal storage and hardware Confirm configuration and included scope in the quotation.
TV console (built-in) Cabinet dimensions, cable access and finish Confirm construction, cable details, and included scope in the quotation.
Shoe rack / entryway Storage layout, door finish and fittings Confirm configuration and included scope in the quotation.
Study desk (built-in) Work surface, storage and cable details Confirm storage, cable details, and included scope in the quotation.
Whole House Customization Measurements, finish and selected fittings Confirm rooms, dimensions, finishes, and included scope in the quotation.

Request a Schedule Review

Share the room details and requested date for a project-specific schedule review. Completion before Hari Raya depends on the confirmed project scope and schedule.

Discuss Your Project WhatsApp Project Details
Project Sequence

Production and Installation Timing

The project sequence and dates are confirmed in the quotation and production documents. Typical production lead time is 10–14 weeks from confirmation and customer sign-off of production drawings; this is not a guarantee of the total project duration.

1. Site Measurement Confirm the site visit and access requirements. The measured dimensions are used to prepare the project drawings for review.
2. Production Drawing Review Review and sign off the production drawings and material specifications. The confirmed schedule starts from the agreed project confirmation and customer sign-off point.
3. CNC Fabrication Fabrication follows the approved drawings and confirmed material specification. Caramella currently uses PUR adhesive for machine edge sealing.
4. Delivery and Installation Confirm delivery, installation dates, countertop inclusion, and site preparation in the written project scope. Quartz stone is the only kitchen countertop material offered by Caramella.

Frequently Asked Questions

Soalan Lazim · Frequently Asked Questions

Can a cabinetry project be completed before Hari Raya?

Share the requested date and project scope for review. Production lead time is typically 10–14 weeks from confirmation and customer sign-off of production drawings; delivery and installation are scheduled separately. Ask for the project dates in writing.

Melayu: Kongsikan tarikh yang diminta dan skop projek untuk semakan. Masa pengeluaran lazimnya 10–14 minggu dari pengesahan dan tandatangan pelanggan pada lukisan pengeluaran; penghantaran dan pemasangan dijadualkan secara berasingan. Minta tarikh projek secara bertulis.

How are urgent timing requests handled?

The requested timing and any effect on project scope or price must be reviewed for the individual project. Confirm feasibility, dates, and price in the written quotation.

Melayu: Masa yang diminta dan sebarang kesannya terhadap skop atau harga projek perlu disemak bagi setiap projek. Sahkan kebolehlaksanaan, tarikh dan harga dalam sebut harga bertulis.

Can the project cover only selected rooms?

Share the rooms and cabinetry you want considered. The written quotation confirms the agreed project scope, materials, and timing.

Melayu: Kongsikan ruang dan kabinet yang ingin dipertimbangkan. Sebut harga bertulis mengesahkan skop projek, bahan dan tempoh yang dipersetujui.

Do you offer financing for renovation?

BIBD At-Tamwil Berhad's Consumer Product Financing vendor list updated 6 January 2025 included Caramella Trading Company. See the financing guide and confirm current terms with the financing provider.

Melayu: Senarai vendor Pembiayaan Produk Pengguna BIBD At-Tamwil Berhad bertarikh 6 Januari 2025 menyenaraikan Caramella Trading Company. Sahkan status dan terma semasa dengan penyedia pembiayaan.

Related Guides

Continue Exploring

Kitchen Pricing Kitchen quotation factors, production timing and renovation process in Brunei. Kitchen guide →
Wardrobe Pricing Built-in and walk-in wardrobe cost guide with type comparison. Wardrobe guide →
Custom Carpentry TV consoles, shoe racks, study desks, and more — built to your measurements. Carpentry guide →
Cabinetry concepts Explore illustrative layouts for kitchens, wardrobes and built-in furniture. Browse concepts →